Haga

Data room

External investor sharing

Corporate Legal

Investor sharing

Draft

Staged unlock — founders only until Gate A + Atlas; then provision investor invites deliberately.

External diligence access is staged. The room exists now for founders; investors sign in only after incorporation hygiene is real.

Investor sharing: Gate A ready— founders only; do not add investor emails to live auth yet

  • Gate A — sole-founder equity + IP signed  — Met. 90/10 + prior-invention schedule locked; sole-founder side letter signed + vaulted 2026-07-17. See Corporate Legal → Founder equity & IP.
  • Atlas trigger — runway-sized committed check  — Open. Primary path: committed check covering Atlas (~$500) + counsel + ops per Financials use-of-funds ($1.0M / 12 mo). Do not file on a Pakistan entity.
  • Delaware C-Corp filed (Stripe Atlas) + stand-up  — Open. Certificate / company kit, EIN, bank, founder stock + confirmatory IP assignments, option pool recorded.
  • Entity docs populated in this room  — Open. Replace Entity placeholders with real docs or private vault links (no secrets in public site deploy).

Stages

StageMeaning
Founders onlyAllowlist is the founder. Investor emails must not authenticate yet.
Gate A ready(current)Equity + IP signed. Atlas may proceed when a runway-sized committed check appears; invites still founders-only.
Atlas ready to fileGate A + funding trigger met. File Delaware C-Corp via Stripe Atlas; still no external investor invites.
IncorporatedDelaware entity stood up. Populate entity placeholders, then unlock external sharing deliberately.
External investor sharingInvestor emails on DATAROOM_INVESTOR_EMAILS may sign in. Provision accounts one at a time.

Locked sequence

Rendering diagram…

Do not cold-outreach or provision investor accounts while Investor sharing shows Founders only.

While Founders only: soft raise can still proceed with a portable bridge packBridge raise deck + public Lab / methodology links. Soft raise open ≠ investor login.

How to unlock (ops)

When Gate A is Ready and budget or a committed check appears:

  1. Complete Formation checklist (Stripe Atlas Delaware C-Corp).
  2. Populate Entity placeholders with real docs or secure links.
  3. Mark incorporation gates complete in founder configuration only after each step is done.
  4. Provision investor accounts deliberately after all gates are met.
  5. Redeploy the dataroom. Investor login stays blocked until the full sequence is complete.

See Disclosure policy for what belongs in the room vs. meetings.

Still separate from evidence outreach

Design-partner cold outreach is unlocked on Phase 3 technical distribution; demand-signal progress (ICP conversations / eval threads) lives on the pipeline. Investor sharing waits on this incorporation sequence.