Haga

Data room

External investor sharing

Corporate Legal

Prior invention schedule

Ready

Gate A — sole founder prior-invention carve-outs (none). Blank schedule = nothing out of scope.

Gate A instrument (schedule). Attached to the IP Assignment & Equity Side Letter. Parent pack: Founder equity & IP.

Rule: IP listed here is claimed as personal and out of scope of the Haga assignment. Rows left blank / “None” means nothing is carved out — all Haga-connected work product stays assignable to the company-to-be.

Signed PDFs with wet/e-signatures stay out of git (private vault only). This page is the living schedule text.


Founder

Field Value
Name Mushood Hanif
Role Sole founder
Date completed 2026-07-17

Carve-outs

# Title / description Date conceived (approx.) Status
None. No prior inventions, works, or materials are carved out of the Haga assignment. Locked

Explicit non-carve-outs (in scope)

The following are not prior inventions for purposes of this schedule; they are Haga work product and fall under the assignment:

  1. haga-core — evaluation harness, configs, experiments, notebooks, results, specs
  2. haga-web — public site, dataroom, landing, methodology surfaces
  3. Brand — Haga name, logos, tokens, domain-related goodwill created for the project
  4. Methodology & data — scoring ideas, calibration, labeled sets, comparative evaluation datasets created for Haga
  5. Commercial narrative — thesis, pitch, market, and evidence materials authored for Haga fundraising / GTM

Personal accounts, education credentials, and non-Haga side projects that never contributed code, data, or branding to Haga are outside this schedule by nature (they are not Haga IP). If a future personal project must be carved out, add a numbered row above before signing confirmatory assignments into the Delaware entity.


Attestation (sign on PDF / side letter)

By signing the side letter, the founder attests that:

  1. This schedule is complete as of the date above
  2. Any invention not listed is not claimed as a personal carve-out against Haga
  3. Updates after signing require a written amendment attached to the confirmatory assignment at Atlas
Founder Schedule complete Signed with side letter Date
Mushood Hanif [x] 2026-07-17 [x] 2026-07-17

Schedule attested with the executed side letter — Gate A pack Ready on Founder equity & IP.